Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/70714
Título: | Projeto e implementação de uma nova linha de produção de autorrádios |
Outro(s) título(s): | Design and implementation of a new car radio production line |
Autor(es): | Cruz, Cátia Daniela Correia |
Orientador(es): | Dinis-Carvalho, José Costa, Susana Raquel Pinto |
Palavras-chave: | Antropometria Configuração de linhas de produção Ergonomia Implementação de novos produtos Lean production Anthropometry Configuration of production lines Ergonomics Implementation of new products |
Data: | 2020 |
Resumo(s): | A presente dissertação foi realizada no âmbito do Mestrado em Engenharia Industrial – Gestão Industrial
da Universidade do Minho e o projeto apresentado na mesma foi desenvolvido durante o estágio
curricular realizado ao abrigo da empresa AptivPort Services S.A, localizada em Braga.
O projeto teve como objetivo principal a implementação de uma nova linha de produção para um novo
produto inserido no portefólio da organização, tendo como objetivos mais específicos atingir um tempo
de ciclo aproximado de 90 segundos na produção em série, estruturar postos de trabalho ergonómicos,
conseguir “one-piece-flow” e zero defeitos à saída da linha.
A primeira fase do projeto consistiu no enquadramento bibliográfico sobre os temas de Lean Production,
produção em célula, ergonomia e ferramentas de avaliação ergonómica, antropometria e indicadores de
desempenho. Posteriormente apresentou-se o estado inicial do contexto do projeto, definindo qual o
objetivo para o estado futuro e estabelecendo-se as ações necessárias para o atingir.
Após a definição das ações, iniciou-se a incorporação do novo produto, sendo explicado todo o
procedimento efetuado desde o balanceamento teórico da linha de produção até à implementação da
linha no chão de fábrica. Após a implementação da linha efetuou-se uma análise ao desempenho da
mesma durante a fase de pré-séries relativamente a indicadores de desempenho, requisitos ergonómicos
e outros fatores onde surgiram oportunidades de melhoria.
Como o projeto passou por implementar uma linha de produção nova, os resultados obtidos traduziramse
na linha propriamente dita, ou seja, na sua implementação física com sucesso, tendo-se conseguido
“one-piece-flow” e sendo adotados mecanismos para conseguir zero defeitos à saída da linha.
Adicionalmente, obtiveram-se resultados ao nível da redução de tempos de ciclo e melhorias ao nível da
qualidade e ergonomia. Estabeleceu-se, ainda, um padrão relativamente às dimensões dos postos de
trabalho para cumprir com os requisitos ergonómicos e, na fase de pré-séries, o tempo de ciclo verificado
cumpriu com o takt time definido. This dissertation was carried out within the scope of the Master’s in Industrial Engineering – Industrial Management at the University of Minho and the project presented was developed during the curricular internship carried out under the company AptivPort Services S.A., located in Braga. The project’s main objective was to implement a new production line for a new product inserted in the organization’s portfolio and had more specific objectives as reaching a cycle time of approximately 90 seconds in series production, structuring ergonomic workstations, achieve one-piece-flow and zero defects at the end of the line. The first phase of the project consisted in the bibliographic framework of the dissertation about Lean Production, cellular manufacturing, ergonomics and ergonomic assessment tools, anthropometry and performance indicators. Subsequently, the initial state of the project’s context was presented, as the future state was defined and the necessary actions to achieve it were established. After defining the actions, the incorporation of the new product began and the entire procedure carried out was explained, from the theoretical balancing of the production line to the implementation of the line on the factory floor. After the implementation of the line, an analysis was made of its performance during the pre-series phase in relation to performance indicators, ergonomics requirements and other factors where opportunities for improvement arose. As the purpose of the project was the implementation of a new production line, the results obtained were translated into the line itself, that is, in its successful physical implementation, having achieved one-pieceflow and adopting mechanisms to achieve zero defects at the end of the line. Additionally, it was possible to obtain results in terms of reduced cycle times and improvements in terms of quality and ergonomics. A standard was also established regarding the dimensions of the workstations to comply with the ergonomic requirements and, in the pre-series phase, the cycle time verified complied with the defined takt time. |
Tipo: | Dissertação de mestrado |
Descrição: | Dissertação de mestrado em Engenharia Industrial (área de especialização em Gestão Industrial) |
URI: | https://hdl.handle.net/1822/70714 |
Acesso: | Acesso aberto |
Aparece nas coleções: | BUM - Dissertações de Mestrado DPS - Dissertações de Mestrado |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Dissertacao Cátia Daniela Correia Cruz.pdf | 22,42 MB | Adobe PDF | Ver/Abrir |
Este trabalho está licenciado sob uma Licença Creative Commons