Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/86755
Registo completo
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Karaz, Mahmoud | por |
dc.contributor.author | Teixeira, José M. Cardoso | por |
dc.date.accessioned | 2023-10-10T08:19:17Z | - |
dc.date.available | 2023-10-10T08:19:17Z | - |
dc.date.issued | 2023-06 | - |
dc.identifier.uri | https://hdl.handle.net/1822/86755 | - |
dc.description.abstract | Traditional planning and control methods do not accurately reflect the construction reality and lack feedback loops. The Last Planner System (LPS) and Location-based Management System (LBMS) have been suggested as socio-technical systems to generate practical and actionable real-life data based on production theories and logic. This data can be effectively communicated, analysed, and managed using the capabilities offered by Building Information Modelling (BIM) workflows. However, a true integration between Lean Construction-BIM is not yet matured, where parallel use of both concepts is still more common. This paper presents a conceptual framework based on a system dynamic modelling approach to elaborate a causal loop diagram (CLD). The CLD explores the interactions between basic management functions and waste, on this basis this paper proposes how the integration between LPS, LBMS, and BIM can be harnessed to apply waste elimination strategies. The results of this study can be applied as lean policy analysis for new lean adaptors to understand the impact of Lean-BIM for planning and controlling various wastes across the construction supply chain | por |
dc.description.sponsorship | This work is funded by National Funds through the FCT - Fundação para a Ciência e Tecnologia, I.P., under the scope of the project 2021.04751.BD | por |
dc.language.iso | eng | por |
dc.publisher | International Group for Lean Construction (IGLC) | por |
dc.relation | 2021.04751.BD | por |
dc.rights | openAccess | por |
dc.subject | Last planner system | por |
dc.subject | Location-based-management | por |
dc.subject | System dynamics | por |
dc.subject | Casual loop diagram | por |
dc.subject | Construction waste | por |
dc.subject | Building information modelling | por |
dc.title | A system dynamic modelling approach for integrated lean-BIM planning and control methods | por |
dc.type | conferencePaper | por |
dc.peerreviewed | yes | por |
dc.relation.publisherversion | https://doi.org/10.24928/2023/0170 | por |
sdum.event.title | 31st Annual Conference of the International Group for Lean Construction (IGLC31) | por |
sdum.event.type | conference | por |
oaire.citationConferencePlace | Lille, France | por |
dc.identifier.doi | 10.24928/2023/0170 | por |
dc.subject.fos | Engenharia e Tecnologia::Engenharia Civil | por |
sdum.conferencePublication | Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) | por |
dc.subject.ods | Produção e consumo sustentáveis | por |
Aparece nas coleções: | C-TAC - Comunicações a Conferências Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Karaz and Teixeira 2023 - A System Dynamic Modelling Approach for Integrated Lean-BIM Planning and Control Methods.pdf | 541,64 kB | Adobe PDF | Ver/Abrir |