Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/83695

Registo completo
Campo DCValorIdioma
dc.contributor.advisorLobarinhas, Pedro M.por
dc.contributor.authorGomes, Diogo André Teixeirapor
dc.date.accessioned2023-03-31T11:05:39Z-
dc.date.available2023-03-31T11:05:39Z-
dc.date.issued2022-
dc.date.submitted2022-
dc.identifier.urihttps://hdl.handle.net/1822/83695-
dc.descriptionDissertação de mestrado integrado em Engenharia Mecânicapor
dc.description.abstractNo âmbito do Mestrado em Engenharia Mecânica - Área de Especialização em Tecnologias Energéticas e Ambientais, da Universidade do Minho, foi realizado um estágio curricular na empresa Lusitar, no decorrer do ano letivo 2021/2022. O presente relatório tem por objetivo a proposta e o desenvolvimento de otimizações relativas ao projeto AVAC implementado na empresa “Browning”, responsável pelo fabrico de armas. A empresa “Browning” é constituída por diversos setores, contudo, o projeto baseou-se na intervenção de três zonas específicas: a zona de pintura, a zona de camuflagem e o armazém de camo-filme, para as quais se definiram algumas propostas de melhorias. Primeiramente, foi sugerida a substituição da válvula “ON/OFF”, presente nas cabines de pintura, por uma válvula reguladora de caudal “Opti Drive”, de modo a ser possível um melhor controlo do sistema, ao invés de, unicamente abrir e fechar o escoamento. A segunda melhoria proposta, consistiu na colocação de uma chapa de 300 mm no topo das cabines de pintura a fim de limitar a área de captação, reduzindo assim o caudal necessário para a mesma velocidade de captação. De seguida, foi recomendada a substituição do filtro “Paint-Stop”, por um filtro de bolsas “F50 Compact pocket filter”, em consequência da rápida colmatação do filtro “Paint-Stop”, tendo em conta a baixa capacidade de armazenamento de partículas. No seguimento desta melhoria, foi ainda proposta a restruturação da cabine de pintura, substituindo a parede de água atualmente presente (pré filtro), por uma parede de filtros “Edrizzi”, permanecendo os filtros de bolsa, referidos anteriormente, como filtros secundários. Por fim, no sistema desenvolvido para a máquina de “aquaprint”, presente na camuflagem, foi igualmente idealizada uma melhoria, realizando um prolongamento da chapa já projetada, a fim de reduzir o caudal necessário ou, em alternativa, aumentar a velocidade de captação para o mesmo volume de caudal. Como conclusão final, é importante salientar a continuidade no processo de otimizações relativas ao projeto AVAC, em virtude das inúmeras direções de aperfeiçoamento que podem ser seguidas, ao invés do modelo de melhorias apresentado.por
dc.description.abstractIn the scope of the Master in Mechanical Engineering - Specialization in Energy and Environmental Technologies, of the University of Minho, a curricular internship was carried out in the company Lusitar, during the school year 2021/2022. This report aims to propose and develop optimizations for the HVAC project implemented in the company "Browning", responsible for the manufacture of weapons. The "Browning" company is composed of several sectors, however, the project was based on the intervention of three specific areas: the painting area, the camouflage area and the camo-film warehouse, for which some improvement proposals were defined. Firstly, it was suggested the replacement of the "ON/OFF" valve, present in the painting booths, by a flow regulating valve "Opti Drive", in order to be possible a better control of the system, instead of just opening and closing the flow. The second improvement proposed, was to place a plate of 300 mm on top of the paint booths in order to limit the area of capture, thus reducing the flow rate required for the same speed of capture. Next, it was recommended the replacement of the "Paint-Stop" filter, by a "F50 Compact pocket filter", as a result of rapid clogging of the "Paint-Stop" filter, taking into account the low storage capacity of particles. Following this improvement, it was also proposed the restructuring of the paint booth, replacing the water wall currently present (pre-filter), by a wall of "Edrizzi" filters, remaining the pocket filters, mentioned above, as secondary filters. Finally, in the system developed for the "aquaprint" machine, present in the camouflage, an improvement was also conceived, making an extension of the already designed plate, in order to reduce the required flow rate or, alternatively, increase the capture speed for the same flow volume. As a final conclusion, it is important to emphasize the continuity in the process of optimizations regarding the HVAC project, due to the numerous directions of improvement that can be followed, instead of the improvement model presented.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0/por
dc.subjectAVACpor
dc.subjectProjetopor
dc.subjectOtimizaçãopor
dc.subjectHVACpor
dc.subjectDesignpor
dc.subjectOtimizationpor
dc.titleOtimização de projeto AVAC baseada na observação da execução em obrapor
dc.typemasterThesiseng
dc.identifier.tid203247965por
thesis.degree.grantorUniversidade do Minhopor
sdum.degree.grade12 valorespor
sdum.uoeiEscola de Engenhariapor
dc.subject.fosEngenharia e Tecnologia::Engenharia Mecânicapor
Aparece nas coleções:BUM - Dissertações de Mestrado
DEM - Dissertações de Mestrado / MSc Thesis

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Diogo André Teixeira Gomes.pdfDissertação de Mestrado5,34 MBAdobe PDFVer/Abrir

Este trabalho está licenciado sob uma Licença Creative Commons Creative Commons

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID