Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/53447
Título: | An Industrial Application of Resource Constrained Scheduling for Quick Changeover |
Autor(es): | Sousa, Rui M. Lima, Rui M. Dinis-Carvalho, José Alves, Anabela Carvalho |
Palavras-chave: | Brooks' algorithm quick changeover resource constrained scheduling setup time SMED |
Data: | 2009 |
Editora: | IEEE |
Revista: | IEEE International Conference on Industrial Engineering and Engineering Management |
Citação: | Sousa, R. M., Lima, R. M., Carvalho, J. D., & Alves, A. C. (2009, December). An industrial application of resource constrained scheduling for quick changeover. In Industrial Engineering and Engineering Management, 2009. IEEM 2009. IEEE International Conference on (pp. 189-193). IEEE |
Resumo(s): | This paper describes the improvement of the quick changeover process of a painting line in a wooden frames factory. The well-known SMED technique (Single Minute Exchange of Die) was applied. However the characteristics of the setup operations (those characteristics also occur in other industrial changeover scenarios) have revealed the possibility of advantageous utilization of resource constrained project scheduling methods. The application of one of these methods represents an innovative contribution to the quick changeover area, allowing (when applicable) the scheduling of the involved setup operations, considering their duration, precedence relations and resources' need, in order to achieve a reduced setup time. |
Tipo: | Artigo em ata de conferência |
URI: | https://hdl.handle.net/1822/53447 |
ISBN: | 9781424448692 |
DOI: | 10.1109/IEEM.2009.5373391 |
ISSN: | 2157-3611 |
Versão da editora: | http://ieeexplore.ieee.org/abstract/document/5373391/?reload=true |
Arbitragem científica: | yes |
Acesso: | Acesso aberto |
Aparece nas coleções: |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
2009 IEEE_IEEM_rms_rml_aa_dc_038_1231.pdf | 622,31 kB | Adobe PDF | Ver/Abrir |