Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/26141

TítuloElectricity cost optimization in a renewable energy
Autor(es)Pereira, Sérgio
Ferreira, Paula Varandas
Vaz, A. Ismael F.
Palavras-chavePlanning model
Wind power
Thermal power
Hydro power
Data9-Mai-2013
Resumo(s)The variable electricity output of the renewable energy sources (RES) power plants, such as wind and hydro power technologies, is seen as an important challenge for the electricity system managers. This paper addresses the problem of an electricity system supported mainly on hydro, thermal and wind power plants, presenting a short-term model planning. A binary mixed integer non-linear optimization model for one year planning with hourly time step is described and applied to a system close to the expected Portuguese electricity scenario for the year 2020. The main objective of this paper was to analyze the impact that different levels of installed wind power and hydropower have in the operation of thermal power units. Besides that, the analysis of results demonstrate the influence that the characteristics of the seasons of the year has on the renewable power units electricity generation and by this way on the total production cost of the system.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/26141
ISBN978-972-95396-8-8
Arbitragem científicayes
AcessoAcesso aberto
Aparece nas coleções:CGIT - Publicações em actas de encontros científicos / Papers in conference proceedings

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Pereira icee 2013.pdfDocumento principal433,64 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID