Título: | Towards the minimization of project duration and cost in stochastic project management environments |
Autor(es): | Reston Filho, José Carlos Tereso, Anabela Pereira Costa, L. |
Palavras-chave: | Project management and Scheduling Stochastic models Multi-objective decision making |
Data: | 2010 |
Resumo(s): | There is a general consensus that the rational use of available resources is, nowadays, an important task, since project managers are interested in the maximization of profit and the minimization of risk. In this work, it is proposed a multi-objective model to optimize the use of resources in a stochastic environment. In this multi-objective formulation the aim is to minimize the project duration and the total project cost at the same time. In the future, we intend to solve this problem using multi-objective evolutionary algorithms. |
Tipo: | Resumo em ata de conferência |
URI: | https://hdl.handle.net/1822/19398 |
Arbitragem científica: | yes |
Acesso: | Acesso aberto |
Aparece nas coleções: | CESP - Resumos Alargados, Resumos, Posters em Actas de Encontros Científicos Internacionais com Arbitragem |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
EUROXXIV2010_Reston_Tereso_Costa.pdf | Abstract | 116,49 kB | Adobe PDF | Ver/Abrir |