Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/15891

Registo completo
Campo DCValorIdioma
dc.contributor.authorFernandes, Nuno Octávio Garcia-
dc.contributor.authorSilva, Sílvio Carmo-
dc.date.accessioned2011-12-27T14:33:44Z-
dc.date.available2011-12-27T14:33:44Z-
dc.date.issued2011-04-15-
dc.date.submitted2009-
dc.identifier.issn0020-7543por
dc.identifier.urihttps://hdl.handle.net/1822/15891-
dc.description.abstractIn this paper, we report a simulation study on the role of sequence-dependent set-up times in decision making at the order release level of a workload controlled make-to-order flow-shop. The study evaluates the potential for set-ups savings, dependent on the level of workload in the shop, for two alternative strategies, namely considering set-up times centrally, within the release decision or locally, within the dispatching decision. These strategies are compared and assessed on the basis of two main performance measures namely time in system and standard deviation of the job lateness. Results indicate that the local strategy, which has been traditionally adopted in practice and in most of the studies dealing with sequence-dependent set-up times, does not always give the best results. The release frequency and the shop workload appear critical to the selection of the strategy to adopt, strongly influencing system performance.por
dc.description.sponsorshipFundação para a Ciência e a Tecnologia (FCT)por
dc.description.sponsorshipUniversidade do Minhopor
dc.language.isoengpor
dc.publisherTaylor and Francispor
dc.rightsopenAccesspor
dc.subjectOrder releasepor
dc.subjectSet-up timepor
dc.subjectSimulationpor
dc.titleOrder release in a workload controlled flow-shop with sequence-dependent set-up timespor
dc.typearticle-
dc.peerreviewedyespor
dc.relation.publisherversionhttp://www.ingentaconnect.com/content/tandf/tprs/2011/00000049/00000008; jsessionid=gip5o86iq07s7.alexandrapor
sdum.publicationstatuspublishedpor
oaire.citationStartPage2443por
oaire.citationEndPage2454por
oaire.citationIssue8por
oaire.citationTitleInternational Journal of Production Researchpor
oaire.citationVolume49por
dc.identifier.doi10.1080/00207541003720376por
dc.subject.wosScience & Technologypor
sdum.journalInternational Journal of Production Researchpor
Aparece nas coleções:CGIT - Artigos em revistas de circulação internacional com arbitragem científica
CESP - Artigos em revistas científicas internacionais com arbitragem

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
OR in WLC with set-up times.pdffull text paper269,75 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID